In the process of creation of a successful software product, there is an inevitable problem of finding a balance between the quality and the release date of the software product. The testing allows of obtaining a product that satisfies all requirements. But the covering of each product risk with various test cases and compiling them take too long. The correctly prepared testing process should provide a required quality level without exceeding project time and budget . If the time for testing was estimated wrongly, it can lead you either to the late product delivery, or to the decrease of its quality and competitiveness . The estimation of time resources in software testing is a rather complicated and volumetric process but its significance for the creation of the successful project shouldn’t be underestimated.
This article contains recommendations that can help you to obtain more realistic and functional time estimates for the testing of a new project.
Written by:
Olga Volzhanina,
QA Specialist of Driver Testing Team
1. Decomposition of Testing Tasks
1.1. Testing Process Planning
1.2. Test Plan and Test Case Development
1.3. Test Environment Configuration
1.4. Execution of Test Cases
2. Debugging of Test Cases After the First Run or Product Change
2.1. Regression Testing
Conclusion
Source: http://www.vietnamesetestingboard.org/zbxe/?mid=download&category=469996&document_srl=526798&listStyle=&cpage=